PIMS is to provide a current status report in respect of physical parts (generally pipes) of the pipeline. Items included in addition to pipes are bends, valves, assemblies, joints and tees.
During the lifetime of the GAIL pipelines, PIMS will keep track of the information related to the constituent parts of the GAIL pipelines (Pipes, Bends, Valves, Assemblies, Joints, Tees, Reducers) readily accessible.
All information in PIMS will be kept as historical records, will act as a valuable tool to many areas of the Project in terms of future requirements, expectations and achieved performance.
All information in PIMS will be kept as historical records, will act as a valuable tool to many areas of the Project in terms of future requirements, expectations and achieved performance.
All information in PIMS will be kept as historical records, will act as a valuable tool to many areas of the Project in terms of future requirements, expectations and achieved performance.
All information in PIMS will be kept as historical records, will act as a valuable tool to many areas of the Project in terms of future requirements, expectations and achieved performance.
Laying of 145.965 km (approx.) long, 24" (610 mm) OD, 10.8/12.4/12.7/15.5 mm WT, API 5L Gr. X-70, PSL-2, SAWL/ SAWH, main pipeline from 3 km approx. downstream of existing SV-24 at Krishangiri district (Ch. 0.000) to upstream of proposed SV-9 (Ch. 145.965 km approx.).
Project Name : KRISHNAGIRI - SALEM PIPELINE PROJECT (KCPL PHASE-I)
�